Once Your Solar Panels Are Installed

Functional Testing

Once your agreement is accepted, a functional test will be performed at the location of your interconnection with South Central Indiana REMC. The functional test is to ensure that the system cannot back feed electricity on the lines during a power outage. (Your meter will be replaced, and your account will change to the SPGS Rate.) Email us to schedule a functional test with SCI REMC.